EVM 256GB SSD 2.5" INCH SATA Storage Devices for Computers Onezeros.in

EVM 256GB SSD 2.5" INCH SATA Storage Devices for Computers

Sale price  Rs. 2,450.00 Regular price Rs. 3,999.00
Skip to product information
EVM 256GB SSD 2.5" INCH SATA Storage Devices for Computers Onezeros.in

EVM 256GB SSD 2.5" INCH SATA Storage Devices for Computers

Sale price  Rs. 2,450.00 Regular price Rs. 3,999.00
Out of stock

EVM 256GB SSD is the perfect storage device for modern computer setups. It offers 256GB of storage capacity and 2.5-inch SATA compatibility. This allows for a lightweight, durable, and high-performance storage solution for a range of computers and devices.

Specifications:
(1) Capacity 256GB
(2) Package Dimension 100mmx69.9mmx7mm
(3) Weight 39gm
(4) Part Number EVM25/256GB
(5) Life expectancy of 1 million hours MTBF
(6) Form Factor 2.5 Inch SATA
(7) Interface SATA 3.0 Gb/s SATA 6.0 Gb/s

Features: 
  • Designed for mainstream PCs and laptops for personal, gaming, and business use
  • Advanced Drive Management through Software to help you manage the drive. User-friendly tools help keep your drives up to date, monitor drive health and speed, and even boost performance.
  • Upgrade to affordable SSD performance with next-gen 3D NAND.
  • Leverage a SATA SSD that provides up to 30× faster speeds than hard drives.
  • Easily upgrade with a 2.5x7mm form factor and SATA connection that allows for universal swap out of SATA drives
  • Remarkable transfer speeds that enable faster bootup and improved overall system performance. The advanced SLC Cache Technology allows a performance boost and a longer lifespan
  • Improves battery life because it’s 45 times more energy-efficient than a typical hard drive
  • Fast start-up, loading, and file transfer   

You may also like